Traffic tie-ups possible today in Danville

Last updated: July 31, 2014 - 12:34pm


DANVILLE — Motorists traveling through the Danville area on Route 54 should expect traffic backups due to a resurfacing project. As of 12:30 p.m., PennDOT was reporting that traffic was "stop-and-go" along the southbound stretch of Route 54 between Route 642 in Valley Township and the Danville-Riverside Bridge and heavy traffic through the borough.

The 2.2-mile micro-surfacing project on Route 54 runs from from the Riverside to Boyd Station in Rush Township. Work began Wednesday and will run through Friday, and possibly Saturday, PennDOT says.

In areas of work, traffic will be down to a single lane, with flagging operators alternating traffic.

For all breaking news alerts and updates, follow us on Twitter.


Last Updated: October 30, 2014 - 8:25pm

A survivalist accused of ambushing two Pennsylvania state troopers, leaving one dead and seriously injuring the other, was captured on Thursday by U.S. marshals in an abandoned airplane...

READ MORE »

Last Updated: October 30, 2014 - 4:03pm

SHICKSHINNY — Police are searching the Shickshinny municipal building after evidence regarding a meth manufacturing case disappeared from a police locker, Mayor Beverly Moore says.

... READ MORE »

Last Updated: October 30, 2014 - 3:46pm

FRANKLIN TWP. — Dixie, the friendly, orphaned raccoon that was taken in by a rural Catawissa family, was shot dead by a Game Commission officer Thursday morning, despite the family’s...

READ MORE »